Terraced Style Multi-Occupancy Building









LV Connection From DNO LV Network (Small)










LV Connection From DNO LV Network (Large)













LV Connection From DNO LV Network (Grouped Metering)












BNO Network With Grouped Metering













BNO Network With Dispersed Metering
















Difference Metering of BNO Network

The drawings contained in this section are diagrammatic only and representative of typical arrangements. Not all of the indicated equipment may be required in every case. Other arrangements to suit particular DNO practices are not precluded. The Developer should have discussions with the DNO at the earliest opportunity to determine what the appropriate arrangement will be.
Note that the use of alternative or novel equipment types (such as rising main distribution boards with built-in “J” type fuseways) is not precluded by the arrangements shown on these drawings.
All arrangements shall be subject to DNO approval. In all cases the BNO Network shall comply with BS 7671.
Typical metering arrangements are shown – Settlement metering is the responsibility of the Supplier; Boundary Metering is the responsibility of the DNO; Difference Metering is the responsibility of the Supplier.
If you would like to find out more about our BNO Services, or have any queries, don’t hesitate to get in touch.